Deer Trail Landslide Repair

  1. 1 Deer Trail Complete
  2. 2 Deer Trail Landslide
  3. 3 Rock work for Deer Trl landslide repair project.
  4. 4 Heavy equipment moving rocks for Deer Trl landslide repair
  5. 5 Heavy equipment filling in rocks for Deer Trl landslide repair
  6. 6 Traffic passing by rock work on Deer Trail Landslide Repair
  7. 7 Rock repair work on Deer Trail in Birch Bay

Contact Us

  1. Brian Walker

    Senior Engineering Technician
    360-778-6266 
    [email protected]

    322 N Commercial Street
    Suite 301
    Bellingham, WA 98225
    Phone: 360-778-6210
    Fax: 360-778-6211

Project Overview

A portion of Deer Trail experienced structural failure and severe erosion from an extreme wet weather event that happened in late 2020 and early 2021. The slide location was approximately 400 feet north of the intersection of Deer Trail and Birch Bay Drive. 

Project Status

The construction phase is substantially complete as of November 2022.

Click the image below to view full screen.

Deer Tr Slide vicinity map