Lummi Island Breakwater Replacement, CRP No. 914015
Lummi Island Breakwater Replacement, CRP No. 914015
Lummi Breakwater Location
Project Summary
This project replaced a small breakwater with a larger and longer breakwater. This will provide for greater safety for the ferry boat from winds as it comes into the dock on the Lummi Island terminal.
Benefits
Improved safety
Improved water quality
Reduced maintenance costs/problems
Improved flood protection/reduced risk of flood damage
Project Update
The breakwater replacement and dolphin repair project was completed in November 2022.
Breakwater construction at Lummi Island Ferry Terminal