Lake Louise Road Pavement Rehabilitation

Map of repaving area of Lake Louise Road in Bellingham

Project Summary

This project will grind and repave all of Lake Louise Road from Austin Street to Lake Whatcom Boulevard. Stormwater improvements include replacing a catch basin at the Mossy Roc parking lot and culvert repair at the east end of Lake Louise Road. 

Project Benefits

  • Newly paved roadway to repair pavement distress areas and increase lifespan 
  • Newly striped roadway to improve lane line visibility and safety
  • New catch basin at Mossy Roc parking lot
  • Repaired culvert at the east end of the project

Project Impacts

Daytime Work Operations: Expect single-lane closures of various lengths and durations during daytime work to adjust utilities, repair distressed pavement areas, and grind, pave, and stripe operations. 

Nighttime Work Operations: The project requires limited night work to adjust utilities and complete culvert repair between Tumbling Water Drive and Lake Whatcom Boulevard. As a result, Lake Louise Road will be fully closed between Tumbling Water Drive and Lake Whatcom Boulevard from 8 p.m. to 7 a.m. on multiple nights. We anticipate two to three nights of closure at the beginning and end of the project. 

These full nighttime closures are required as certain work in this area cannot be safely completed with single-lane closures due to the limited roadway width. Advanced notice and a signed detour route will be implemented during these closures.