Truck Road Bank Stabilization Project

Project Summary

Truck Road was previously damaged due to North Fork Nooksack River erosion during the November 2021 floods, and subsequently underwent emergency repair. Additional road rehabilitation and environmental mitigation work was completed end of August 2024.

Project Documents

Contact Us

  1. Christina Schoenfelder

    Project Engineer 
    360-778-6274
    [email protected]

    322 N Commercial Street
    2nd Floor
    Bellingham, WA 98225

Project Overview:

  • Status: Complete 
  • Contractor: Trimaxx
  • Award Amount: $1,087,238.44


Project Photos

  1. 1 Bank erosion along Truck Road in Whatcom County due to the Nooksack River.
  2. 2 Bank erosion of Truck Road area due to flow of Nooksack River.
  3. 3 A roller drives over freshly paved road as part of the Truck Road replacement project.
  4. 4 Bank erosion is repaired along Truck Road in Whatcom County.
  5. 5 View of the newly completed Truck Road from the Nooksack River side of the guardrail.
  6. 6 River side view of the Truck Road Bank Stabilization project, looking towards Truck Road.